Product Lead Time

PRODUCT FAMILY PRODUCT TYPICAL LEAD TIME NOTES
DualVee Wheels, Original Guide Wheels 1 day Orders received after noon PST will ship the following business day. Large orders may require additional lead time.
  Wheels, Studded, SWS Series 2-5 Days Orders received after noon PST will ship the following business day. Large orders may require additional lead time.
  Wheels, Studded, SWA Series 2-5 Days Orders received after noon PST will ship the following business day. Large orders may require additional lead time.
  Wheels, Custom Please Contact Contact 925.439.8272 or info@bwc.com for details.
  Bushings 1 Day to 3 Weeks Most items will ship the following business day. Large orders may require additional lead time.
Contact 925.439.8272 or info@bwc.com for details.
  Journals 1-2 Days Large orders may require additional lead time.
  Lubricators 1-2 Days  
  Wheel Covers 1-2 Days  
  Wrenches 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
  Standard/Catalog Drilled Track 3 Days to 2 Weeks Many catalog products can ship the following business day. Large orders may require additional lead time.
  Custom Drilled Track 4 Days to 2 Weeks Large orders may require additional lead time.
  Cut (Undrilled) Track 3 Days to 1.5 Weeks Many std. catalog products can ship the following business day.
Large orders may require additional lead time.
 
Hepco Ring and Track Systems 4-8 Weeks  
  Bearings 4-9 Weeks Specific bearings: 12+ Weeks.
Contact 925.439.8272 or info@bwc.com for details.
  Slides (straight track) 6-10 Weeks Orders >12 m (total length) may require additional lead time.
  DLS 6-10 Weeks Orders >4 pcs and pieces longer than 16 m may require additional lead time.
  PDU2 4-6 Weeks Orders >3 pcs and pieces longer than 12 m may require additional lead time.
  Other 6-8 Weeks Contact 925.439.8272 or info@bwc.com for details.
 
LoPro LoPro Quick Ship (QS) ≤1 week

LoPro Quick Ship Qualifiers:

  • Less than 5 Systems
  • Belt-driven and undriven actuators only
  • EXCLUDING: SIZE 4
    Sizes 1, 2S, 2L, 3
  • Unmounted or Aluminum beam mounted only
  • System travel < 2.4 m
  • May include gantry bracket kits and/or gantry plate kits (assembly required)
  • Excludes systems with motors, motor mounts, or gearheads

Contact 925.439.8272 or info@bwc.com for details.
  Belt Driven 1-4.5 Weeks Contact 925.439.8272 or info@bwc.com for details.
  Chain Driven 1-6 Weeks Contact 925.439.8272 or info@bwc.com for details.
  Lead Screw Driven 10 - 18+ Weeks Contact 925.439.8272 or info@bwc.com for details.
  Ball Screw Driven 6 -12+ Weeks Contact 925.439.8272 or info@bwc.com for details.
  Gantry Kit ≤1 week Latest Gen. Gantry Brackets in stock
Contact 925.439.8272 or info@bwc.com for details.
  Motor Mounts 4-6 Weeks  
  Wheel Plate 3-5 Days  
  Track Plate 3 - 10 Days  
  Other Sub-assemblies 3-5 Days  
 
MadeWell Radial Wheels 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
  Crown Rollers 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
 
MinVee Track, Drilled 1 - 2 Weeks Some Catalog parts may ship following business day.
  Track, Cut (Undrilled) 3 Days –1.5 Weeks Larger orders may require additional lead time.
  Track Support, Drilled 3-5 Days  
  Wheel Plate Assembly 3-5 Days  
 
QuickTrak All QTS/QTD Items Please Contact Contact 925.439.8272 or info@bwc.com for details.
 
Signature Motion ECO60 3 - 4 Weeks

Standard Catalog Travel lengths (6", 12", 18" & 24") may ship sooner.
Contact 925.439.8272 or info@bwc.com for details.

  Slick Stick - Std. lengths 3 - 4 Weeks

Standard Catalog Travel lengths (6", 12", 24" & 36") may ship sooner.
Contact 925.439.8272 or info@bwc.com for details.

  SteadyRail 3-6 Weeks  
  XLA15 / XLA9 6-8 Weeks  
 
Utilitrak Wheel Plate Assembly, PW Series 1-2 Weeks  
  Wheel Plate Assembly, SW Series 1-2 Weeks  
  Wheel Plate Assembly, CR Series 1-2 Weeks  
  Wheel Plate Assembly, VC Series 1 Week Contact 925.439.8272 or info@bwc.com for details.
  Wheel Plate Brake Kit 2-3 Days  
  Track, PW Series, Aluminum 2-3 Days  
  Track, SW Series, Steel 3 Days to 1.5 Weeks Some profiles are out of stock.
Larger orders will require additional lead time.
Contact 925.439.8272 or info@bwc.com for details.
  Track, CR Series, Corrosion Resistant 5 Days - 2 Weeks  

NOTES:
  • Lead times are accurate when parts are available and/or in stock.

  • Additional or special processes such as anodizing/plating/painting can add an additional 1-3 Weeks to the lead time.

  • Lead times do not include shipping time, FOB Pittsburg, CA.

  • HEPCO Products: If the lead-time falls during the last week in December, add two additional Weeks due to the international holiDays.

  • Expedites are possible. Call 925.439.8272 for details.

PRODUCT FAMILY PRODUCT TYPICAL LEAD TIME NOTES
DualVee Wheels, Original Guide Wheels 1 day Orders received after noon PST will ship the following business day. Large orders may require additional lead time.
  Wheels, Studded, SWS Series 2-5 Days Orders received after noon PST will ship the following business day. Large orders may require additional lead time.
  Wheels, Studded, SWA Series 2-5 Days Orders received after noon PST will ship the following business day. Large orders may require additional lead time.
  Wheels, Custom Please Contact Contact 925.439.8272 or info@bwc.com for details.
  Bushings 1 Day to 3 Weeks Most items will ship the following business day. Large orders may require additional lead time.
Contact 925.439.8272 or info@bwc.com for details.
  Journals 1-2 Days Large orders may require additional lead time.
  Lubricators 1-2 Days  
  Wheel Covers 1-2 Days  
  Wrenches 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
  Standard/Catalog Drilled Track 3 Days to 2 Weeks Many catalog products can ship the following business day. Large orders may require additional lead time.
  Custom Drilled Track 4 Days to 2 Weeks Large orders may require additional lead time.
  Cut (Undrilled) Track 3 Days to 1.5 Weeks Many std. catalog products can ship the following business day.
Large orders may require additional lead time.
 
Hepco Ring and Track Systems 4-8 Weeks  
  Bearings 4-9 Weeks Specific bearings: 12+ Weeks.
Contact 925.439.8272 or info@bwc.com for details.
  Slides (straight track) 6-10 Weeks Orders >12 m (total length) may require additional lead time.
  DLS 6-10 Weeks Orders >4 pcs and pieces longer than 16 m may require additional lead time.
  PDU2 4-6 Weeks Orders >3 pcs and pieces longer than 12 m may require additional lead time.
  Other 6-8 Weeks Contact 925.439.8272 or info@bwc.com for details.
 
LoPro LoPro Quick Ship (QS) ≤1 week

LoPro Quick Ship Qualifiers:

  • Less than 5 Systems
  • Belt-driven and undriven actuators only
  • EXCLUDING: SIZE 4
    Sizes 1, 2S, 2L, 3
  • Unmounted or Aluminum beam mounted only
  • System travel < 2.4 m
  • May include gantry bracket kits and/or gantry plate kits (assembly required)
  • Excludes systems with motors, motor mounts, or gearheads

Contact 925.439.8272 or info@bwc.com for details.
  Belt Driven 1-4.5 Weeks Contact 925.439.8272 or info@bwc.com for details.
  Chain Driven 1-6 Weeks Contact 925.439.8272 or info@bwc.com for details.
  Lead Screw Driven 10 - 18+ Weeks Contact 925.439.8272 or info@bwc.com for details.
  Ball Screw Driven 6 -12+ Weeks Contact 925.439.8272 or info@bwc.com for details.
  Gantry Kit ≤1 week Latest Gen. Gantry Brackets in stock
Contact 925.439.8272 or info@bwc.com for details.
  Motor Mounts 4-6 Weeks  
  Wheel Plate 3-5 Days  
  Track Plate 3 - 10 Days  
  Other Sub-assemblies 3-5 Days  
 
MadeWell Radial Wheels 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
  Crown Rollers 1 day Orders received after noon PST will ship the following business day.
Large orders may require additional lead time.
 
MinVee Track, Drilled 1 - 2 Weeks Some Catalog parts may ship following business day.
  Track, Cut (Undrilled) 3 Days –1.5 Weeks Larger orders may require additional lead time.
  Track Support, Drilled 3-5 Days  
  Wheel Plate Assembly 3-5 Days  
 
QuickTrak All QTS/QTD Items Please Contact Contact 925.439.8272 or info@bwc.com for details.
 
Signature Motion ECO60 3 - 4 Weeks

Standard Catalog Travel lengths (6", 12", 18" & 24") may ship sooner.
Contact 925.439.8272 or info@bwc.com for details.

  Slick Stick - Std. lengths 3 - 4 Weeks

Standard Catalog Travel lengths (6", 12", 24" & 36") may ship sooner.
Contact 925.439.8272 or info@bwc.com for details.

  SteadyRail 3-6 Weeks  
  XLA15 / XLA9 6-8 Weeks  
 
Utilitrak Wheel Plate Assembly, PW Series 1-2 Weeks  
  Wheel Plate Assembly, SW Series 1-2 Weeks  
  Wheel Plate Assembly, CR Series 1-2 Weeks  
  Wheel Plate Assembly, VC Series 1 Week Contact 925.439.8272 or info@bwc.com for details.
  Wheel Plate Brake Kit 2-3 Days  
  Track, PW Series, Aluminum 2-3 Days  
  Track, SW Series, Steel 3 Days to 1.5 Weeks Some profiles are out of stock.
Larger orders will require additional lead time.
Contact 925.439.8272 or info@bwc.com for details.
  Track, CR Series, Corrosion Resistant 5 Days - 2 Weeks  

NOTES:
  • Lead times are accurate when parts are available and/or in stock.

  • Additional or special processes such as anodizing/plating/painting can add an additional 1-3 Weeks to the lead time.

  • Lead times do not include shipping time, FOB Pittsburg, CA.

  • HEPCO Products: If the lead-time falls during the last week in December, add two additional Weeks due to the international holiDays.

  • Expedites are possible. Call 925.439.8272 for details.